Labour Rates




BuildInfo offers you information on the prevailing Labour Rates under various categories. You can find this information by selecting appropriate search criteria as provided below. Rates for more cities will be added soon.
 Work Items:  City/District:  Category:       
Last Updated On: 01-Mar-2017  
 Pune:
CategoryWork ItemsSpecificationRates/Unit
CarpentryFixing of ready made door frame200 - 300 Per no
CarpentryPly door frameIncludes cutting , making & fixing of ply door frame in 18 & 12 mm ply including fixing of lipping patti and cover moulding800 - 1100 Per no
CarpentryPly door frame with Laminates / VineerIncludes cutting , making , laminate / vineer pasting & fixing of ply door frame in 18 & 12 mm ply including fixing of lipping patti and cover moulding1000 - 1400 Per no
CarpentryFixing of door shutterIncludes cutting & fixing of door shutter , fixing of lipping patti , door hardware.650 - 800 Per no
CarpentryFixing of laminate / vineer door shutterIncludes cutting & fixing of door shutter , Pasting of laminate / vineer ,fixing of lipping patti , door hardware.1200 - 1400 Per no
Departmental WorkMale coolie ( M/C)250 - 300 Per no
Departmental WorkFemale coolie ( F/C )175 - 250 Per no
Masonry + Plaster4" BBM 12 - 14 Per sqft
Masonry + Plaster6" BBM14 - 16 Per sqft
Masonry + Plaster9" BBM18 - 20 Per sqft
Masonry + PlasterSunk pointing for UCR10 - 12 Per sqft
Masonry + PlasterSalai pointing for UCR6 - 9 Per sqft
Masonry + PlasterInternal sanala finish plaster14 - 16 Per sqft
Masonry + PlasterInternal rough finish plaster13 - 15 Per sqft
Masonry + PlasterExternal single coat plasterRate excluding scaffolding18 - 22 Per sqft
Masonry + PlasterExternal Double coat plasterRate excluding scaffolding20 - 25 Per sqft
Masonry + PlasterBrick work plus Plaster rate on built up area basisIn built up area - Parking 50% , All floors 100% , Top terrace 50% , OHWT/LMR - one slab area 65 - 80 Per sqft
PlumbingToilet plumbingIncludes internal plumbing, all external uptake and downtake lines, CP and sanitary items fixing7000 - 8000 Per no
PlumbingKitchen / Dry balcony plumbingIncludes internal plumbing, external downtake lines ,CP fitting fixing2800 - 3000 Per no
Plumbing6" RCC pipe laying22 - 24 Per rft
PlumbingMaking of Inspection chamberIncludes BBM , plaster , ghotai, frame fixing1750 - 2500 Per no
RCC3" thick PCC6 - 8 Per sqft


  Pages: 1 2 3 
Powered by    IMC logo
© Big Slice Technologies Pvt. Ltd.(OPC), 2018

About Us     Privacy Policy     Terms & Conditions     Contact Us